Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants

U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation. for proper system operation and will evaluate the protection provided to the electrical system from dust accumulation in SRP Section 8.3.1. In the review of the ...

Author: U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation

Publisher:

ISBN:

Category: Nuclear power plants

Page:

View: 693


Energy Research Abstracts

44793 ( NTISUB / B / 201—015 - R6 ) Standard Review Plan for the review of safety analysis reports for nuclear power plants , Revision No. 1 to Section 15. ( Nuclear Regulatory Commission , Washington , DC ( USA ) .

Author:

Publisher:

ISBN:

Category: Power resources

Page:

View: 987



UPDATING THE NRC STANDARD REVIEW PLAN CHAPTER 8 ELECTRICAL SYSTEMS

The Standard Review Plan (SRP) (Reference 2), provides guidance to the regulatory staff of the Nuclear Regulatory Commission (NRC) on performing their safety reviews of applications to construct or operate nuclear power plants, and ...

Author:

Publisher:

ISBN:

Category:

Page:

View: 875

The Standard Review Plan (SRP) (Reference 2), provides guidance to the regulatory staff of the Nuclear Regulatory Commission (NRC) on performing their safety reviews of applications to construct or operate nuclear power plants, and applications to approve standard designs and sites for nuclear power plants. Chapter 8 of the SRP provides guidance related to the review of station electrical distribution systems described by the applicant in its Design Control Document (DCD) or Safety Analysis Report (SAR). As part of the 2006-2007 SAR update, all sections in this Chapter (8.1, 8.2, 8.3.1, 8.3.2, Appendix 8A, and Appendix 8B) were revised to incorporate new analyses, design approaches, and the lessons learned from the review of the AP 1000 design certification and to assure consistency with the draft Regulatory Guide DG-1145, ''Combined License Applications for Nuclear Power Plants (LWR Edition)''.

DEVELOPMENT OF HFE SECTIONS OF DG 1145

NUREG-0800, the NRC Standard Review Plan (SRP), provides guidance to the NRR staff reviewers on performing their safety reviews of these applications.

Author:

Publisher:

ISBN:

Category:

Page:

View: 465

For the licensing of the current fleet of commercial nuclear power plants (NPPs), the Nuclear Regulatory Commission (NRC) used two key documents, NUREG-0800 and Regulatory Guide (RG) 1.70. RG 1.70 provided guidance to applicants on the contents needed in their Safety Analysis Reports (SARs) submitted as part of their application to construct or operate an NPP. NUREG-0800, the NRC Standard Review Plan (SRP), provides guidance to the NRR staff reviewers on performing their safety reviews of these applications. As part of the preparation for a new wave of improved NPP designs the NRC is in the process of updating the SRP and is also developing a new RG designated as draft RG or DG-1145, ''Combined License Applications for Nuclear Power Plants (LWR Edition).'' This will eventually become RG 1.206 and will take the place of RG 1.70. This will provide guidance for combined license (COL) applicants, as well as for other 10CFR Part 52 variations that are permitted.

Comparisons of ANS ASME AWS and NFPA Standards Cited in the NRC Standard Review Plan NUREG 0800 and Related Documents

This report provides the results of comparisons of the cited and latest versions of ANS, ASME, AWS and NFPA standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and ...

Author:

Publisher:

ISBN:

Category:

Page:

View: 954

This report provides the results of comparisons of the cited and latest versions of ANS, ASME, AWS and NFPA standards cited in the NRC Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants (NUREG 0800) and related documents. The comparisons were performed by Battelle Pacific Northwest Laboratories in support of the NRC's Standard Review Plan Update and Development Program. Significant changes to the standards, from the cited version to the latest version, are described and discussed in a tabular format for each standard. Recommendations for updating each citation in the Standard Review Plan are presented. Technical considerations and suggested changes are included for related regulatory documents (i.e., Regulatory Guides and the Code of Federal Regulations) citing the standard. The results and recommendations presented in this document have not been subjected to NRC staff review.